全過程工程咨詢 Whole process of engineering consulting service


對(duì)工程建設(shè)項(xiàng)目前期研究和決策以及工程項(xiàng)目實(shí)施和運(yùn)行(或稱運(yùn)營)的全生命周期提供包含設(shè)計(jì)和規(guī)劃在內(nèi)的涉及組織、管理、經(jīng)濟(jì)和技術(shù)等各有關(guān)方面的工程咨詢服務(wù),具體包含以下階段:


規(guī)劃與設(shè)計(jì)階段  Planning and design phase

建設(shè)項(xiàng)目概念研究
Study on the concept of construction project.

項(xiàng)目投資方案比較研究
The Comparative Study on project investment schemes.

編制項(xiàng)目建議書;總體策劃(功能、投資、工期)
Draw up project proposals, overall schemes(function, investment and time limit).

編制項(xiàng)目可行性研究報(bào)告
Drawing up the study report of project feasibility.

編制項(xiàng)目投資估算
Draw up project assessment plans.

編制初步設(shè)計(jì)概算書
Draw up primary design budgetary reports.

編制施工圖設(shè)計(jì)預(yù)算書
Draw up construction drawings and design budget reports.

按估算的建設(shè)費(fèi)用編制初步現(xiàn)金流量表和成本計(jì)劃
Draw up primary cash flow tables and cost plans according to the estimated construction cost.

按業(yè)主投資控制預(yù)算實(shí)施經(jīng)濟(jì)限額設(shè)計(jì)
Execute economic limitation design according to the clients’ investment budgetary.

招標(biāo)投標(biāo)階段  Bidding phase

對(duì)工程合約形式,招標(biāo)方案提供意見
Make suggestions for the style of engineering agreement and bidding schemes.

編制招標(biāo)文件,草擬合同條款,代理招標(biāo)手續(xù)
Draw up bidding documents, sketch out contract items, and deputize bidding procedures.

編制詳細(xì)的單項(xiàng)工程/單位工程/分部分項(xiàng)工程/分部位、分樓層的工程量清單,分析工程用料明細(xì)、機(jī)電設(shè)備采購明細(xì)
Draw up detailed item projects, unit projects, subsection and item projects, and the quantity lists by location and floor, analyze the list of materials and equipment order.

從技術(shù)與經(jīng)濟(jì)角度分析標(biāo)書,評(píng)標(biāo),為決標(biāo)提供意見
Make suggestions for the final decision of the bidding under the analysis of tenders and bidding evaluation from a technical and economic point of view.

與相關(guān)方進(jìn)行標(biāo)書和技術(shù)經(jīng)濟(jì)談判
Negotiate with the parties concerned about bidding documents in regard to technique and economy.

最后協(xié)助或代理簽訂工程合同
Help sign the contract as an agent.

實(shí)施階段  Construction phase

協(xié)助組織施工圖會(huì)審
Help organize the meeting for the check of construction drawing check together.

工程項(xiàng)目的現(xiàn)場管理
On site management for the project.

觀察施工現(xiàn)場,評(píng)估形象進(jìn)度,以便計(jì)算和審核中期進(jìn)度款項(xiàng)
On-the-spot check, assessment for image progress so as to calculate and audit progress payment.

對(duì)隱蔽工程進(jìn)行現(xiàn)場勘測記錄
Execute an on-the-spot reconnaissance for concealed work.

對(duì)設(shè)計(jì)變更進(jìn)行估值,以便確認(rèn)合同價(jià)款增減金額
Assess the modification in drawings, so as to confirm the increased and decreased sums for the contract.

查詢材料、設(shè)備市場實(shí)際價(jià)格,以便招標(biāo)釆購確定價(jià)格
Inquire about the actual prices of materials and machine markets, so as to ascertain the price forbidding.

定期編制工程報(bào)表,列明進(jìn)度及預(yù)算開支執(zhí)行情況和工程項(xiàng)目管理方面的業(yè)績及成果明細(xì)
Draw up project report forms regularly, label out the implementation concerning progress and budget and the performance and the achievements in project management.

竣工移交階段  The stage of completion and transference

編制、審核工程結(jié)算書
Drawing up and auditing project balance reports.

與相關(guān)方議定最終財(cái)務(wù)支付賬目,包括處理質(zhì)量維修金、抵扣款、罰金等項(xiàng)
Confirm the final payment items with the parties concerned, including quality maintenance funds, deduction and penalties and so on.

建立健全項(xiàng)目管理檔案資料
Establish and perfect project archives.

提出項(xiàng)目預(yù)算執(zhí)行情況分析報(bào)告
Put forward the analytical report for the execution for budget.

提供工程管理咨詢報(bào)告書
Provide consultation reports for project management.
地址: 湖北省武漢市洪山區(qū)文化大道555號(hào)融創(chuàng)智谷A7-4
電話: 027-81321519
傳真: 027-81321519
員工天地  |   網(wǎng)站管理  |   企業(yè)郵箱  |   工信部備案號(hào):鄂ICP備15017281號(hào)
Copyright ? 2024 Powered By djr546.cn All Rights Reserved 網(wǎng)站技術(shù)支持: 文創(chuàng)網(wǎng)絡(luò)科技